top of page
-VACUUM PROCESS
Thermal Deposition system
PVD / CVD / E-BEAM / SPUTTER
Vacuum component
-GLOVEBOX & PURIFICATION SYSTEM
VACUUM FURNACE SYSTEM / CDA GLOVEBOX SYSTEM
ENCLOSER / ISOLATOR
SINGLE, 1.5, 2.0 Person / etc Hybrid Type.
spec.
-
Main chamer (1, 1.5, 2 person)
Materials : Stainless steel 3,4t
Window : PolyCarbonate 8t
Glove : Butyl 8"
Power : 220v 2ea, 110v 2ea
-
Anti chamber
Dimension : 230X230 500L
Materials : Stainless steel 4t
Slide tray : 220 x 500 Stainless steel
-
Mini Anti chamber
Dimension : Ø114 x 200L
Materials : Stainless steel 3t
-
Purifier
Materials : Stainless steel 3t
Dimention : 15ℓ
System : PLC control
Filtering : Molecular sieve/ oxygen scavenger
Moisture/oxygen removal
: Oxygen moisture concentration 1 ppm or less
-
Work stand
Materials : Steel Frame (Treatment : paint IVORY)
Caster : 3" Level Foot
-
OPTION
Moisture Analyzer /OxygenAnalyzer/ Refrigerator
상기 사양은 사용환경에 따라 사용자 요구에 적합하도록 변경될 수 있습니다.
-OLED AMBIENT CHAMBER
OLED PANNEL생산에서 R,G,B 물질 증착 후 신호기와 probe를 이용하여 특성, 색도, 불량, 두께 등을 측정하는 검사용 Ambient N2 Chamber
(INK JET, REVERSER 적용)
반도체 물류, 세정 자동화 장비 및 대학/연구소 실험장비
00
WORK PROCESS
: 업무프로세스
01
상담 / 검토
요구사항의 구현가능성, 적합성, 합리성 등을 종합적으로 검토, 판단하는 단계
02
Concept Model 작성
고객의 요구하는 제품의 사양을 종합적으로 판단하여 Concept Drawing 및 제안서 제출 및 제품의 예상가격을 견적하는 단계
03
승 인 (Accept)
요구사양이 반영된 설계도면을 고객사로부터 확인하고 수정/역제안을 통해 세부적인 요구사항을 반영하는 단계
04
제작 / 중간검수
작성된 도면을 기초로 제품을 제작하는 단계로 고객사의 요구사항이 제품에 제대로 반영되어 있는지 확인하는 단계
05
운전/성능 점검
제작 완료된 제품의 운전 및 성능을 시험하는 단계로 제품의 완전성 등을 시험하는 단계
06
납품 및 검수
수요처에 장비를 설치하고 목적된 결과를 확인하는 단계로 운전 / 성능 등을 검증하는 단계
07
업무지원
설치된 제품의 사용 교육 및 발생될 수 있는 ISSUE및 A/S에 대하여 지원
bottom of page